Sign In | Join Free | My himfr.com |
|
Ask Lasest Price | |
Brand Name : | LiQi |
Model Number : | OEM |
Certification : | ISO,GE |
Price : | Negotiable |
Payment Terms : | L/C, D/A, D/P, T/T, Western Union, MoneyGram |
Supply Ability : | 100000 Piece/Pieces per Month |
Delivery Time : | 35-50 days |
Reliance Material ABS Injection Mold Customized Products
ABS Injection Mold Information:
Mold information | Reliance Material ABS Injection Mold Customized Products |
Product Material | ABS,PP,PC,PA,PMMA,PS,POM and etc. |
Moldbase | FUTABA,LKM,HASCO,DME you can choose |
Cavity material | 45#,50#,P20,H13, 718 2738, NAK80, S136, SKD61 etc |
Runner | Cold/Hot runner |
Cavity | Multi or single cavity |
Standart parts | Hasco |
Gate type | Side gate,Sub gate,Pin point gate,Edge gate etc |
Treatment | Heat treatment and Nitriding,polish ect. |
HRC | H45~52 |
Tooling lifespan | 300,000-1,000,000 shots |
Machine type | 90~650Ton |
The standard of appearance of the products for stripe | MT(Mold Tech),YS,HN series |
Lead time | 15~30 days |
Product Description
Product Material | PP/PVC/PE/HDPE/TPU/PMMA/TPU/NYLON6/NYLON66 |
Mould material | P20/H718/S136 |
Mould life | 500,000 shots |
Software | CAD/IGS /STEP/STP /PDF |
Package | Wooden case |
Gate type | Pinpoint Gate, Edge Gate, Sub Gate, Film Gate, Valve Gate, Open Gate, etc. |
Mould time | 40 days for first time testing sample |
Injection time | 3-5 days after confirmation of the sample |
Shipping time | 18-30 days sea shipment |
Payment terms | 50% advanced payment before mould making, balance after sample confirmed. |
ABS Injection Mold Material Processing Concerns:
As the water absorption values in the table above show, ABS tends
to absorb moisture. Therefore, it must be fully dried before
processing, which adds time and costs — but failing to remove
moisture can result in molded parts with cloudiness, bubbles, or
surface lines. If your parts require a high gloss, highly
reflective surface, more than nine hours of dry time may be
required.
ABS Injection Mold Pressure:
Because of ABS’s viscosity, higher injection pressures are needed
than for many other materials, but lower pressures may still be
suitable for smaller, simpler, or thicker products. Just bear in
mind that if the injection pressure is too high, increased friction
can cause molded parts to stick, which complicates their removal
and adds to production costs. If the pressure is too low, mold
shrinkage increases and can result in out-of-tolerance parts that
won’t meet end-use requirements.
FAQ
1. When can I get the price?
A: We usually quote within 24 hours after we get your inquiry.
2. How long is the lead time for mold?
A: It depends on the mold’s size and complexity. Normally, it nees
about 25-35 days.
3. I don't have 3D drawing, how should I start the new project?
A: You can provide us a sample, we will make 3D drawing design.
4. Can we mass produce in your local?
A: Yes, you can leave the mould in our factory, we can produce for
you.
5. Can we get a sample when mould finished?
A: Yes, we usually send out samples for customers' checking, then
mass production after samples comfirmed.
6. Before shipment, how to make sure the products quality?
1) We have QC to inspect the products before each shipment.
2) We can send you videos to show the production process.
3) You can come to visit our factory or ask a third party for
inspection.
7. How could I pay?
A: Paypal, Western Union, T/T are acceptable, so just let us know
which is convenient for you.
8. How to ship?
A: By sea/ By air/ By Express.
![]() |